Factory Expansion | The Second Phase of the Mingke Project Kicks Off

On March 1 (an auspicious day for the dragon to raise its head), Nanjing Mingke Transmission System Co., Ltd. (hereinafter referred to as “Mingke”) officially commenced construction of its second-phase factory in Gaochun!

2

Quick Facts About the Project

  • Address: Gaochun, Nanjing
  • Total Area: approximately 40000 square meters
  • Project Duration: Loading…
  • Major Upgrade: Static and Equal-Pressure Double Steel Belt Press
  • Core Business: Localization and Substitution of Key Materials for New Energy andWood-Based Panels

Leaders Praised the Project On-Site:

During the ceremony, the leaders delivered speeches, congratulating Mingke on its rapid growth and expressing high hopes for the smooth progress of the second-phase factory expansion!

A Word from the Chairman

Chairman Lin Guodong: “The expansion of the second-phase factory is not just a physical expansion but also a leap in technological capability. With the new facility as our starting point, we will accelerate product innovation and process upgrades, further enhance production capacity, and drive Mingke to achieve even greater breakthroughs in the transmission systems industry.”

Did You Know

The furniture panels, new energy equipment, and other products you use may already benefit from Mingke’s precision steel belts, silently playing a crucial role behind the scenes!

 

 

 


Post time: Mar-04-2025
  • Previous:
  • Next:
  • Get A Quote

    Send your message to us: